Datasets / New South Wales / Wagga Wagga City Council
Wagga Wagga City Council open data
Wagga Wagga City Council lists 40 datasets on data.nsw.gov.au. 0 of them have an open licence and a file or API we can read.
On the portal
40 datasetsThese are the datasets Wagga Wagga City Council lists on data.nsw.gov.au. A vote asks us to serialise one. Only the licence can stop us, so a dataset without an open licence cannot take a vote.
| Dataset | Formats | Licence | Updated | Votes |
|---|---|---|---|---|
| Uranquinty Levee Upgrade 100% DesignThe design report for the Uranquinty Levee upgrade | Licence Specified by Agency | 2026-07-23 | licence not open | |
| Lake Albert Feasibility Study Final Report with AppendicesA pdf report that outlines the methodology, constraints and final outcomes for the study. | Licence Specified by Agency | 2026-02-01 | licence not open | |
| Wagga Wagga Major Overland Flow - Model Update Report - ReportComplete Report | CC-BY | 2026-01-19 | no download | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - ReportVolume 1: Report Volume 2: Figures and Appendices | CC-BY | 2026-01-19 | no download | |
| GRD&FS_ReportsGlenfield Road Drain and Flowerdale Storage Mitigation Works and Feasibility Study Final Report | Licence Specified by Agency | 2026-01-15 | licence not open | |
| Wagga Wagga - Floodplain Risk Management Plan - ReportComplete report, including figures and appendix. | CC-BY | 2026-01-15 | no download | |
| Wagga Wagga Floodplain Risk Management Study - ReportComplete report | CC-BY | 2026-01-15 | no download | |
| Tarcutta, Ladysmith and Uranquinty Flood Studies - Data Collection ReportComplete report | CC-BY | 2026-01-14 | no download | |
| Flood Mitigation options for North Wagga - Evaluation of optionsAn analysis of hr flood mitigation options for North Wagga and the recommendation of a preferred option. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River - Flood Mitigation Study - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River - Flood Modelling 2012 - ReportReport, Figures and Appendix | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Flood Modelling - DTMDTM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Flood Modelling - Hydraulic Model InputTUFLOW | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Flood Modelling - Hydraulic Model OutputTUFLOW | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Flood Modelling - ReportComplete | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Wagga Wagga - Flood Study - Figures49 PDF figures | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Wagga Wagga - Flood Study - Graphs12 PDF graphs | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Wagga Wagga - Flood Study - Hydraulic ModelRUBICON | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Murrumbidgee River Wagga Wagga - Flood Study - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Oura to Braehour Design Flood Event Mapping - ReportComplete Report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Spreadsheet and GIS data for floor levels and overfloor floodingSpreadsheet and GIS data for floor levels and overfloor flooding based on the four catchments in the study | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Tarcutta, Ladysmith and Uranquinty Floodplain Risk Management Studies and Plans - Report and AppendicesThe final report and the three appendices covering each village in particular, The creeks that are part of this study are Tarcutta Creek, Kyeamba Creek and Sandy Creek. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Tuflow Models for the four catchmentsTuflow models for the four catchments, including base, models and runs | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Moffs Spatial DataThe GIS data for the Wagga MOFFS project | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga - Levee Gradient Sensitivity Assessment - Flow and Water Level MeasurementsFlow and Water Level Measurements (Data Extracted from Pinneena V6 by KJL 29/07/04) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga - Levee Gradient Sensitivity Assessment - Hydraulic Model Inputs (RUBICON)Hydraulic Model Inputs (RUBICON) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga - Levee Gradient Sensitivity Assessment - Hydraulic Model Outputs (RUBICON)Hydraulic Model Outputs (RUBICON) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga - Levee Gradient Sensitivity Assessment - ReportReport and Figures | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Floodplain Risk Management Study (Draft) - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Levee - Visual Audit of Urban Levees Non Tidal Areas of NSW - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Levee Upgrade Detailed Design Report - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Major Overland Flow Floodplain Risk Management Scoping Study - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga MOFFS ReportsThe report in volume 1 and the figures and Appendices are in volume 2 | CC-BY | 2025-12-17 | no download | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - Dataset Handover DescriptionDataset Handover Description | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - Flood DamagesFlood Damages | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - GIS - FiguresGIS - Figures | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - Hydraulic Model Inputs (TUFLOW)Hydraulic Model Inputs (TUFLOW) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - Hydraulic Model Outputs (TUFLOW)Hydraulic Model Outputs (TUFLOW) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - Spatial Flood LayersFlood Planning Area; Peak Flood Depth; Peak Flood Extents; Peak Flood Level. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Wagga Wagga Revised Murrumbidgee River Floodplain Risk Management Study and Plan - WaterRIDEWaterRIDE Files | Licence Specified by Agency | 2025-12-17 | licence not open |
Listed from the portals' own catalogues, read 28 September 2026. Wagga Wagga City Council has not endorsed this site. Every dataset here keeps its publisher's licence and attribution. catalogue.json has this list as data.