Datasets / New South Wales / Unknown
NSW Unknown open data
Unknown lists 109 datasets on data.nsw.gov.au. 3 of them have an open licence and a file or API we can read.
On the portal
109 datasetsThese are the datasets Unknown lists on data.nsw.gov.au. A vote asks us to serialise one. Only the licence can stop us, so a dataset without an open licence cannot take a vote.
| Dataset | Formats | Licence | Updated | Votes |
|---|---|---|---|---|
| Dora Creek Floodplain Risk Management Study and Plan - GIS LayersSpatial data related to a number of the figures in the flood study. | CC-BY | 2026-09-11 | no download | |
| Jewells Wetland FRMS& P - Flood mappingData contains GIS files for: hydraulic category flood depth flood velocity flood water level provisional hazard Each folder contains full range of event magnitudes: 2yr ARI (50% AEP) 5yr ARI (20% AEP) 10yr ARI (10% AEP) 20yr ARI (5% AEP) 50yr ARI (2% AEP) 100yr ARI (1% AEP)… | CC-BY | 2026-09-11 | no download | |
| Lake Macquarie LGA Vegetation Community Map 2022 VIS_ID 5117 - Version 2This dataset comprises of native vegetation communities within the boundaries of native vegetation extant in the Lake Macquarie City Council (LMCC) Local Government Area (LGA). These communities were originally mapped by Stephen Bell and Collin Driscoll using the methodology… | API, PDF, SPATIAL VIEWER, ZIP | CC-BY | 2026-05-07 | |
| Elliot Lake Little Lake FRMSP ReportsElliot Lake Little Lake FRMSP Reports | Licence Specified by Agency | 2026-04-05 | licence not open | |
| North Creek Warners Bay flood Risk Management Study and Plan - Final ReportThe primary aim of this study and plan is to provide a more informed understanding of flood risks and impacts across the study area and develop a long-term strategy to manage this risk. The flood risk management study and plan expands upon information provided in the updated… | Licence Specified by Agency | 2026-03-11 | licence not open | |
| Jewells Wetland FRMS& P - ReportProject report | CC-BY | 2026-02-12 | no download | |
| Lake Macquarie City Flood Studies & Floodplain Risk Management Studies/Plans - MapMap displaying the extents of flood studies, floodplain risk management studies/plans, and the years of their completion. | Licence Specified by Agency | 2026-01-20 | licence not open | |
| Dora Creek Flood StudyThe Dora Creek Flood Study 2015 updates the 1986 Dora Creek Flood Study. It was undertaken to update and extend the study area to include the townships of Dora Creek, Cooranbong and Avondale and to incorporate the implications of predicted climate change. The results provide the… | CC-BY | 2026-01-15 | no download | |
| Dora Creek Floodplain Risk Management Study and Plan - ReportIntroduction The Dora Creek Flood Risk Management Plan has been prepared for Lake Macquarie City Council (Council) in accordance with the NSW Floodplain Development Manual (April 2005 - Reference 1) and the August 2010 Flood Risk Management Guide – Incorporating sea level rise… | CC-BY | 2026-01-15 | no download | |
| Lake Macquarie Waterway - Flood Risk Management Study & PlanFlood Risk Management Study & Plan - Main report (Part 1 of 4) This Lake Macquarie Waterway Flood Risk Management Study and Plan constitutes a review of the second and third stage of the management process, namely the August 2000 Lake Macquarie Floodplain Management Study and… | CC-BY | 2026-01-15 | no download | |
| Lake Macquarie Waterway - Flood Study 2012The key objective of this Flood Study is to develop a suitable hydrologic/hydraulic model that can project flood and permanent inundation water levels in Lake Macquarie from rainfall, sea level rise and storm surge. These results will be used by Lake Macquarie City Council, in… | CC-BY | 2026-01-15 | no download | |
| Lt Creek Floodplain Risk Management Study and Plan - ReportMain report | CC-BY | 2026-01-15 | no download | |
| Winding Creek and Lower Cockle Creek Flood StudyFlood Study June 2017 | CC-BY | 2026-01-15 | no download | |
| Winding Creek and Lower Cockle Creek Flood Study - ReportComplete report | CC-BY | 2026-01-15 | no download | |
| Winding Creek and Lower Cockle Creek Floodplain Risk Management Study and PlanFloodplain Risk Management Study and Plan June 2017 | CC-BY | 2026-01-15 | no download | |
| Elliot Lake - Little Lake Floodplain Risk Management PlanExecutive Summary Cardno were commissioned by Shellharbour City Council to undertake the Floodplain Risk Management Study and Plan for the Elliot Lake – Little Lake catchment area Background The Elliot Lake – Little Lake catchment lies south of Lake Illawarra and drains to the… | CC-BY | 2026-01-14 | no download | |
| Elliot Lake - Little Lake Floodplain Risk Management StudyExecutive Summary Cardno were commissioned by Shellharbour City Council to undertake the Floodplain Risk Management Study and Plan for the Elliot Lake – Little Lake catchment area. The Elliot Lake – Little Lake catchment lies south of Lake Illawarra in the Shellharbour LGA and… | CC-BY | 2026-01-14 | no download | |
| Stony Creek Floodplain Risk Management PlanThis Floodplain Risk Management Study investigates what can be done to reduce or manage the effects of flooding in the catchment. The Floodplain Risk Management Plan recommends a mix of strategies to manage the risks of flooding. Using the merits-based approach advocated in the… | CC-BY | 2026-01-14 | no download | |
| Stony Creek Floodplain Risk Management StudyReport only. | CC-BY | 2026-01-14 | no download | |
| Jewells Wetland Flood StudyFinal Report PDF | CC-BY | 2026-01-13 | no download | |
| Lake Illawarra, Mt Warrigal and Oak Flats Flood Study - ReportReport and Figures | CC-BY | 2026-01-13 | no download | |
| LT Creek Flood StudyFinal Report - PDF | CC-BY | 2026-01-13 | no download | |
| Morans Creek, Stockton Creek, Mullards Creek, Clacks Creek, Melaleuca Creek and Dora Creek Flood Study (Final Report) November 2025Flood study report prepared by Engeny for Lake Macquarie City Council - Final report data 11 November 2025 - PDF format | Licence Specified by Agency | 2025-12-22 | licence not open | |
| Belmont Bay - Waterway Study - ReportComplete Report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Cockle Creek - Floodplain Risk Management Plan October 2004Summary of Management Plan (1) Most of the flood damage reduction measures considered as part of the 1993 Floodplain Management Study cannot be justified on benefit-cost considerations. They could be reconsidered if new information becomes available that leads to substantially… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Coincidence of Rainfall, Ocean Level & Wind for Lake Macquarie - ReportComplete Report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Dora Creek - Flood Study May 1986Report only | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Dora Creek - Floodplain Management PlanThe purpose of the Floodplain Management Plan for Dora Creek is to ensure that: • The use of flood liable land is planned and managed in a manner compatible with the assessed frequency and severity of flooding. • Flood liable lands are managed having regard to social, economic… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Dora Creek Floodplain Management Study - Hydraulic Analysis of Subdivision Options - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Dora Creek Floodplain Risk Management Study and Plan - Public ExhibitionPublic Exhibition Report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - ConsultationMeetings, public exhibitions, brochure, survey | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - EmergencyFERP classification region | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Extents1y to PMF, as well as climate change | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Flood Planning LevelExisting region, 2050 climate change, 2100 climate change | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Hazard5y to PMF | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Hydraulic ModelSOBEK | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Hydrologic Model InputXP-RAFTS | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - Hydrologic Model OutputXP-RAFTS | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - ReadMeSummary | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake - Little Lake Flood Study (Draft) - ReportsMain report; Other associated reports, including stage reports Costings Flood damages | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Elliot Lake Little Lake Floodplain Risk Management Studystudy was done with associated plan | CC-BY | 2025-12-17 | no download | |
| ELLL Data Handover Read-MeELLL Data Handover Read-Me | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Flood Studies for Eight Residual Lake Macquarie Waterway Tributary Catchments - Main ReportData Contains main report and mapping | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Horsley Creek Flood Study - ReportComplete report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Horsley Creek FRMS Final ReportFinal Report PDF, including all figures and appendices | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Jewells Wetland FRMS& P - ARR2016 Data HubData hub summary | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Jewells Wetland FRMS& P - Flood damagesFlood damage calculations | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Jewells Wetland FRMS& P - Hydraulic and Hydrological modelsData contains: Hydrological (RAFTS) files Hydraulic (Tuflow) files | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Illawarra, Mt Warrigal and Oak Flats Flood Study - Dataset Handover DescriptionDataset Handover Description | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Illawarra, Mt Warrigal and Oak Flats Flood Study - Hydraulic Model Inputs (TUFLOW)Hydraulic Model Inputs (TUFLOW) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Illawarra, Mt Warrigal and Oak Flats Flood Study - Hydraulic Model Outputs (TUFLOW)Hydraulic Model Outputs (TUFLOW) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Illawarra, Mt Warrigal and Oak Flats Flood Study - Spatial Flood LayersFlood Depths; Flood Velocity; Water Levels; VxD Product; Flood Hazard; Hydraulic Categorisation; Flood ERC; FPA; Flood Affected Properties. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Macquarie - Flood Study - ReportZip file includes Lake Macquarie Flood Study Part 1 – Design Lake Water Levels and Wave Climate Report MHL682 January 1998 Lake Macquarie Flood Study Part 2 – Foreshore Flooding Report MHL715 April 1998. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Macquarie - Floodplain Management Plan August 2001Floodplain Management Plan Report and figures. This Plan provides the basis for the future management of flood liable lands adjacent to the lake in the Lake Macquarie City Council area. The Plan was developed from the Lake Macquarie Flood Study (Part 1 - January 1998 and Part 2… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Macquarie - Floodplain Risk Management Study October 2000The objectives of this study are: to define the nature and extent of the flood hazard, to identify, assess and optimise strategies and measures aimed at reducing the impact of flooding on both existing and future development, to determine the effects of development on flooding… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Macquarie Waterway flood study 2012 Hydrology Hydraulics data folderShapefiles, TUFLOW hydraulic model and WBNM hydrological model for Lake Macquarie Waterway Flood study 2012. Prepared by WMA Water. Design flood approach includes adopted hydraulic modelling approach, hydrologic model and coincidence of ocean levels and runoff. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lower Jewells Swamp - Flood StudyLower Jewells Swamp Flood Study and management options of ocean outlets | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lt Creek Floodplain Risk Management Study and Plan - Flood damages assessmentflood damage assessment spreadsheet | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lt Creek Floodplain Risk Management Study and Plan - GISSpatial data for: Creeks Damages Flood extents gauges land zone boundaries LMCC GIS data study area | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lt Creek Floodplain Risk Management Study and Plan - HydraulicsTuflow input data. Contains data for ARR1987 and ARR2016 | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lt Creek Floodplain Risk Management Study and Plan - Hydrological dataContains data for: ARR2016 & ARR1987; 20y and 100yr AEP events IFD Data hub | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lt Creek Floodplain Risk Management Study and Plan - resultsWaterRIDE and Tuflow outputs 20yr and 100yr ARI | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - AerialAerial photographs (ECW files) from 1948 to 2011. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Collected DataPast flood studies and some survey information. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - HandoverRead me | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Hydraulic Model InputTUFLOW | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Hydraulic Model OutputTUFLOW; Calibration, design and sensitivity | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Hydrological Model InputWBNM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Hydrological Model OutputWBNM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - ReportThe Macquarie Rivulet catchment drains an area of 110 square kilometres extending from the shores of Lake Illawarra upstream for a distance of approximately 23 km to the Illawarra escarpment. The upper parts of the catchment (up to 770 mAHD) are characterised by steep gradients… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Spatial - Enveloped GridsCalibration and design | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Flood Study - Spatial - GIS MappingFigures | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - April 2024 Flood EventThe dataset contains model input files and results for the April 2024 Flood event | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - DamagesDesign and Option Damages | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Design TUFLOW XMDF ResultsDesign XMDF results | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Figure LayersGIS layers used in the Figures. | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Hydraulic ModelThe dataset contains the TUFLOW hydraulic model. | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Hydrological ModelThe dataset includes the Hydrological model for the Macquarie Rivulet Catchment. | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Option XMDF ResultsTUFLOW XMDF results for the the mitigation options | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Processed ResultsProcessed Results. | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - Read meHandover Description | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - ReportThe dataset includes the final report, figures and appendices for the Macquarie Rivulet Floodplain Risk Management Study and Plan. | CC-BY | 2025-12-17 | no download | |
| Macquarie Rivulet Floodplain Risk Management Study and Plan - ResultsThe dataset contains TUFLOW model results. | CC-BY | 2025-12-17 | no download | |
| Main reportFinal report. No figures. | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Mandalong Coal Mine: Flood Study (Draft) - Report3 parts | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Minnamurra River - Calculation Of Flood Discharges at the Swamp Rd Bridge - ReportReport | Licence Specified by Agency | 2025-12-17 | licence not open | |
| North Creek Flood StudyIn view of the increasing catchment development and the need to accurately define the flood problem, Lake Macquarie City Council engaged Webb, McKeown & Associates, to undertake a Flood Study. The primary objectives of this Flood Study are: • to define the flood behaviour of the… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| North Creek Warners Bay Flood Study January 2025 Final Report - All appendices & figures includedThis document constitutes the first and second stages of the management process for the North Creek catchment. It presents a compilation of the data collected and has defined flood behaviour and flood risk for the catchment area. This study was commissioned under the 2005 NSW… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Report - 2D Stormwater Modelling Study SwanseaData contains: main report Appendix B figures for main report AVIs animations | Licence Specified by Agency | 2025-12-17 | licence not open | |
| South Creek Flood StudyFlood Study August 2010 | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Stony Creek Flood StudyThe objectives of the Flood Study are to: • Identify all the flood-related data by searching all relevant data sources. • Determine the likely extent and nature of flooding and identify potential hydraulic controls by carrying out detailed site visits of the study area. • Define… | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Stony Creek Floodplain Risk Management Study and Plan – Climate Change Assessment Discussion PaperIncludes figures and graphs | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Stony Creek, Toronto - Report on Storm of February 1981 and Flood Plain Management Plan - ReportComplete Report | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Surfrider Caravan Park - Little Lake Study - ReportScanned, some pages unclear | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Upper Cockle Creek Flood Study - ReportsData contains main report, figures and appendices | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek - Flood Mitigation Study Executive Summary - ReportReport (Executive Summary) | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - Community ConsultationIncludes questionnaire, newsletter and results | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - DataMiscellaneous data Hydrology Photos | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - Hydraulic Model InputTUFLOW | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - Hydraulic Model OutputTUFLOW | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - Hydrologic Model InputWBNM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - Hydrologic Model OutputWBNM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Winding Creek and Lower Cockle Creek Flood Study - SpatialGIS Properties CatchmentSIM | Licence Specified by Agency | 2025-12-17 | licence not open | |
| Lake Macquarie LGA Vegetation 2012 VIS_ID 2307 - supersededThis record is now superseded. The current record can be found here: https://datasets.seed.nsw.gov.au/dataset/lake-macquarie-lga-vegetation-community-map-2022-vis id-5117 Lake Macquarie City Council Working Composite Vegetation Community Map undertaken by Stephen Bell and Colin… | PDF, ZIP | CC-BY | 2025-10-23 | |
| Koalas in the landscape (KITL1.0) modelling for NSWKoalas in the landscape (KITL1.0) enhances the prioritisation of landscape conservation actions for the Koala Strategy. It measures and forecasts the statewide status and trends in population persistence and habitat carrying capacity, considering future climate change based on… | GEOTIFF, PDF | CC-BY | 2025-01-28 | no download |
| Find my LIA Band as at 1 Sep 2021Find my LIA Band as at 1 Sep 2021 | CSV | CC-BY | 2021-09-03 | |
| Premises list as of 1 Nov 2020A monthly list of liquor licences including information such as liquor licence number, name, address, LGA, Licensee name, Trading Status, authorisation information, trading hours information and gaming data information. | CSV | none stated | 2020-11-02 | no licence stated |
| New test datasetTest | none stated | 2020-09-23 | no licence stated | |
| NSW Interim Native Vegetation ExtentA NSW Native Vegetation Extent layer prepared for the National Land and Water Resources Audit 2008. This represents native vegetation extent at 2006. A number of other useful intermediate products are also available. Woody and non-woody vegetation extent covers all of NSW… | WEBLINK | CC-BY | 2019-06-11 | no download |
Listed from the portals' own catalogues, read 28 September 2026. Unknown has not endorsed this site. Every dataset here keeps its publisher's licence and attribution. catalogue.json has this list as data.