publicdataau
This is an independent republication of open government data. No government agency is affiliated with it or has endorsed it. Every file names its publisher, its licence and the attribution the licence asks for.
Datasets / New South Wales / Albury City Council

Albury City Council open data

Government New South WalesDatasets listed 32Open with a download 0Served here 0

Albury City Council lists 32 datasets on data.nsw.gov.au. 0 of them have an open licence and a file or API we can read.

On the portal

32 datasets

These are the datasets Albury City Council lists on data.nsw.gov.au. A vote asks us to serialise one. Only the licence can stop us, so a dataset without an open licence cannot take a vote.

DatasetFormatsLicenceUpdatedVotes
Eight Mile Creek Flood Study Review - Final ReportsEight Mile Creek Flood Study Review Final ReportLicence Specified by Agency2026-06-10licence not open
Albury Floodplain Risk Management Study and Plan - Report - 2016Complete report The Albury Floodplain Risk Management Study assesses floodplain management issues in the Albury LGA, and investigates potential management options for the area. The study, which follows on from the flood studies undertaken for the area, has been undertaken in…CC-BY2026-01-14no download
Bungambrawatha Creek, Lavington, South Albury and West Albury Flood Study - ReportVolume 1 - Final report Volume 2(a & b) - FiguresCC-BY2026-01-14no download
Albury City to Greater Hume Murray River Flood Study - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Management Plan - Report - Jan 2003Complete report Albury City Council recognises the significant impact that flooding has on residents and ratepayers and the costs that flooding, particularly large events, imposes on the community. A sustainable and implementable FMP is needed to assist Council in its decision…Licence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - AerialsAerial ImageryLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Collected Data (Council)Cadastre - Boundaries, SuburbLocatities, Land Parcels, Easements, Properties, Roads, Railways; Planning - FloraFauna, Flood Referral Area. Murray REP2, ALEP 2010, Parklands; Utilities - Electricity, Substations; Waterways - Major and Minor StreamsLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Flood DamagesFlood DamagesLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Floor Level SurveyFloor Level SurveyLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Hydraulic Model Inputs (MIKE-11)Hydraulic Model Inputs (MIKE-11)Licence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Hydraulic Model Inputs (TUFLOW)Hydraulic Model Inputs (TUFLOW)Licence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Post-Processed ResultsPost-Processed ResultsLicence Specified by Agency2025-12-17licence not open
Albury Floodplain Risk Management Study and Plan - Report Figures (GIS)Report Figures (GIS)Licence Specified by Agency2025-12-17licence not open
Audit of Flood Levees for New South Wales - City of Albury - ReportComplete report (office copy)Licence Specified by Agency2025-12-17licence not open
Eight Mile Creek Flood Study - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
Lavington Catchment - Flood Risk Scoping Study - ReportCompleteLicence Specified by Agency2025-12-17licence not open
Lavington Catchment Flood Study (Draft) - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
Murray River Flood Scoping Study - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
South Albury - Flood Mitigation Strategy - ReportComplete ReportLicence Specified by Agency2025-12-17licence not open
South Albury Levee Rehabilitation - Statement of Environmental Effects - Design Drawings31-15663-C001 - LOCATION PLAN AND DRAWING LIST 31-15663-C002 - EXISTING LEVEE SITE PLAN 31-15663-C003 - EXISTING LEVEE SITE PLAN -AND VEGETATION 31-15663-C004 - FLOOD LEVEE DETAIL PLAN - SHEET 1 31-15663-C005 - FLOOD LEVEE DETAIL PLAN - SHEET 2 31-15663-C006 - FLOOD LEVEE -…Licence Specified by Agency2025-12-17licence not open
South Albury Levee Rehabilitation - Statement of Environmental Effects - ReportComplete Report ("Issued for Comment" Version)Licence Specified by Agency2025-12-17licence not open
South Albury Levee Rehabilitation - Statement of Environmental Effects - Technical SpecificationsTechnical SpecificationsLicence Specified by Agency2025-12-17licence not open
South Albury Levee Update - Murray River Flood Study ReportsThis document details the flood modelling and mapping of the Murray River at Albury. The study was commissioned by the Albury City Council to inform the design of the South Albury levee upgrade. This report supersedes previous flood studies for the Murray River at Albury and…CC-BY2025-12-17no download
South Albury Levee Upgrade - Murray River Flood Study Spatial LayersProcessed flood modelling outputs - including flood extents, flood planning area and hydraulic categorisation (i.e. floodway, flood storage, flood fringe)CC-BY2025-12-17no download
South Albury Levee Upgrade and Feasibility - Collected DataMiscellaneous collected dataLicence Specified by Agency2025-12-17licence not open
South Albury Levee Upgrade and Feasibility - Hydraulic Model Inputs (TUFLOW)Hydraulic Model Inputs (TUFLOW)Licence Specified by Agency2025-12-17licence not open
South Albury Levee Upgrade and Feasibility - Hydraulic Model Outputs (TUFLOW)Hydraulic Model Outputs (TUFLOW)Licence Specified by Agency2025-12-17licence not open
South Albury Levee Upgrade and Feasibility - Hydraulic Model Outputs (TUFLOW) - Post-ProcessedHydraulic Model Outputs (TUFLOW) - Post-ProcessedLicence Specified by Agency2025-12-17licence not open
South Albury Levee Upgrade and Feasibility- ReportComplete ReportLicence Specified by Agency2025-12-17licence not open
Thurgoona Creek & Albury Airport - Flood Study Draft - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
Thurgoona Creek and Albury Airport Flood Study - ReportComplete reportLicence Specified by Agency2025-12-17licence not open
Warragamba - Flood Study - Stage 1This report describes the hydraulic modelling for the first stage of a flood study of the Hawkesbury-Nepean Valley commissioned by the Water Board in 1987. The study is required in order to "determine the effects that various arrangements of major or future works for Warragamba…Licence Specified by Agency2021-04-21licence not open

Listed from the portals' own catalogues, read 28 September 2026. Albury City Council has not endorsed this site. Every dataset here keeps its publisher's licence and attribution. catalogue.json has this list as data.